STAGE 2

The second stage, located behind the first building, will be a slightly larger, five-storey office building with an underground carpark. The main entrance to the building complex will be accessible via al. Grunwaldzka. There will be additional entry from its sister building. The area near ul. Wassowskiego will be accessible to pedestrian and vehicle traffic. Construction of Stage II will occur concurrently with Stage I.

BUILDING SPECIFICATION

Gross Leasable Area (GLA): 7.311,4 sq. m

Office space: 6.804,3 sq. m

Space per floor: approx. 1.770 sq. m (typical floor)
approx. 1.249,5 sq. m (floor 4)

Space per floor: 5

No. of car spaces:e: 73 underground and 9 above the ground

Additional facilities: shower and lockers for cyclists (level -1)

Certificate precertyfikacja precertification LEED Gold

Architect:na: APA Wojciechowski Architekci

Lease enquiries, please contact: komercjalizacja@torus.pl

SITE PLAN

SITE PLAN

LOCATION

TIME OF WAY

GDYNIA CITY CENTRE  40 min.
SOPOT 20 min.
GDAŃSK CITY CENTRE 10 min.
TRICITY RINGROAD 10 min.
GDAŃSK LECH WAŁĘSA AIRPORT 15 min.
RAILWAY STATION  5 min.
WARSAW 3h 30 min.

OFFICE SPACE FEATURES

OFFICE SPACE FEATURES

BUILDING FEATURES

Professional-looking lobby on the ground floor

Fast and safe system of 2 quiet lifts

24/7 with CCTV

Central, autonomous ventilation system and a glycol-free air conditioning system with dx-free cooling function

Expanded Building Management System (BMS)

Data security (UPS units and power generator)

Bezpieczeństwo danych (UPS generator)

One-way power supply

Openable windows fitted with reed switches

Disability-friendly office